The time required to repair a transformer varies greatly depending on factors such as the **type of fault, the specifications
of the transformer, and the method of repair**. The following are the time ranges and influencing factors for common situations:
I. Main Factors Affecting the Repair Time
1. **Type of Fault**
- **Minor Faults** (such as loose wiring, blown fuses, minor insulation damage):
**Duration**: **1-4 hours** (Can be completed through on-site repair).
- **Serious Faults** (such as burned windings, damaged core, oil leakage/insulating oil contamination):
**Duration**: **Several days to several weeks** (May require returning to the factory for repair or replacing core components).
2. **Type of Transformer**
- **Dry-Type Transformer**: With a relatively simple structure, the repair is usually faster (**1 day to 1 week**).
- **Oil-Immersed Transformer**: Issues such as insulating oil handling and sealing need to be dealt with, and the repair time
is longer (**1 week to 3 weeks**).
3. **Availability of Spare Parts**
- **Common Components** (such as fuses, bushings): Can be obtained within **1-3 days**.
- **Customized Components** (such as specific windings, cores): **2 weeks to 1 month** (Require production by the manufacturer).
4. **Method of Repair**
- **On-Site Repair**: Simple faults can be completed on the same day.
- **Repair at the Factory**: The transportation + repair time is usually **1 week to 1 month**.
II. Time Examples of Typical Repair Scenarios
Fault Scenario | Repair Time | Explanation |
The fuse on the low-voltage side is blown | 30 minutes - 2 hours | Replace the fuse and test |
Local overheating and burning of the winding (dry type) | 3 days - 1 week | Remove the old winding, customize a new winding, and reassemble and test |
Oil leakage + insulating oil contamination of the oil-immersed transformer | 1 - 2 weeks | Drain the oil, clean the oil tank, replace the seals, inject new oil, and test |
Loose silicon steel sheets of the core or abnormal noise | 2 - 5 days | Disassemble the transformer, fasten the core, and recalibrate |
Fault of the control circuit board (with intelligent monitoring function) | 1 - 3 days | Replace the circuit board and program and debug |
III. Suggestions: Repair vs Replacement
- **Suitable for Repair**:
- The transformer has a short service life (< 10 years), the fault is sporadic, and the repair cost is less than 30%
of the price of new equipment.
- It is necessary to quickly restore power supply in an emergency situation (such as temporarily replacing spare parts).
- **Suggested Replacement**:
- Old transformers (> 15 years) have frequent faults, and the repair cost is close to the price of new equipment (especially
for models of 75kVA and above, the price of new equipment is about $2500 - $7000).
- The fault involves core components (such as the core, windings), and there is no guarantee of reliability after repair.
Summary
**Simple Faults**: **On the same day to 3 days**; **Complex Faults**: **1 week to 1 month**.
If you need a quick estimate, you can contact the repairer, provide the transformer model and the fault phenomenon,
and obtain a specific quotation and time plan.