How to reduce the maintenance cost of box-type substations?
To reduce the maintenance cost of box-type substations, it is necessary to start from multiple aspects
such as design, operation, maintenance, and management, and formulate targeted strategies by combining
the characteristics of the equipment and actual needs. The following are specific suggestions:
### I. Optimize Equipment Selection and Design
1. **Select High-reliability Equipment**
- Give priority to the selection of maintenance-free or low-maintenance equipment (such as dry-type
transformers and fully sealed switchgear) to reduce the frequency of failures caused by equipment aging.
- Adopt a modular design to facilitate the rapid replacement of faulty components and reduce maintenance
time and labor costs.
2. **Enhance Environmental Adaptability**
- In corrosive or humid environments, select enclosures with anti-corrosion coatings and moisture-proof
insulation materials to extend the service life of the equipment.
- Optimize the heat dissipation design (such as adding natural ventilation holes and temperature-controlled
fans) to reduce equipment wear caused by high temperatures.
### II. Implement Preventive Maintenance
1. **Formulate a Scientific Inspection Plan**
- Regularly check vulnerable points such as the contact pressure of contacts, the tightness of cable joints,
and the sealing of the enclosure to prevent small problems from evolving into major failures.
- Use an infrared thermometer to monitor the temperature rise of the equipment and promptly detect
abnormal heating.
2. **Carry Out Condition Monitoring**
- Install an online monitoring system (such as partial discharge monitoring and oil chromatographic analysis)
to provide real-time warnings of potential faults and reduce sudden shutdowns.
- Remotely monitor key parameters such as the oil temperature of the transformer, the winding temperature,
and the load rate through intelligent sensors, and optimize the operation strategy.
### III. Improve Maintenance Efficiency
1. **Standardize the Maintenance Process**
- Develop a detailed maintenance manual and clarify the replacement cycle of each component (such as seals
and lightning arresters) to avoid excessive or insufficient maintenance.
- Train maintenance personnel to master rapid diagnostic skills and reduce the time for troubleshooting.
2. **Optimize Spare Parts Management**
- Stock commonly used vulnerable parts (such as fuses and capacitors) to ensure timely replacement and reduce
the shutdown cost caused by the shortage of spare parts.
- Sign long-term cooperation agreements with suppliers to obtain discounted prices and priority supply services.
### IV. Extend the Service Life of Equipment
1. **Control the Operating Load**
- Avoid long-term overload operation, and ensure that the equipment operates within the rated range through
load balancing or capacity expansion measures.
- For scenarios with large seasonal load fluctuations (such as cooling loads in summer), adjust the operating
parameters in advance.
2. **Improve the Operating Environment**
- Regularly clean up the weeds and accumulated water around the enclosure to prevent the intrusion of small
animals and blockage of heat dissipation.
- Install dust filters in dusty areas to reduce the insulation degradation caused by dust accumulation on the
equipment surface.
### V. Intelligent Management and Data Analysis
1. **Establish a Digital Archive**
- Record the historical faults, maintenance records, and operating data of the equipment, predict the fault
trends through big data analysis, and optimize the maintenance plan.
2. **Introduce AI-assisted Decision-making**
- Use artificial intelligence algorithms to analyze the equipment status data, automatically generate maintenance
suggestions (such as predictive component replacement), and reduce human judgment errors.
### VI. Economic Strategies
1. **Energy Performance Contracting (EPC)**
- Sign long-term maintenance agreements with professional operation and maintenance companies to reduce
the single maintenance cost through large-scale services.
2. **Insurance and Risk Sharing**
- Purchase equipment insurance to transfer the risk of repair costs for major faults (such as transformer burnout).
### Case References
- **A City Power Distribution Company**: By installing an intelligent monitoring system, the fault response time
was shortened from 4 hours to 30 minutes, and the annual maintenance cost was reduced by 25%.
- **An Industrial Park**: By adopting a modular box-type substation design, the module replacement can be
completed within 2 hours when a single piece of equipment fails, reducing the production shutdown loss by
more than 500,000 yuan per year.
Through the comprehensive application of the above measures, the full-life-cycle maintenance cost of box-type
substations can be significantly reduced, and the power supply reliability can be improved at the same time.
When actually implementing, the strategies need to be flexibly adjusted according to the equipment model,
operating environment, and management requirements.